NHP.com.au:Industrial, Automation, Motor, Control, Circuit, Breakers, Soft, Starters  
Home About NHP Why NHP? Products Catalogues Careers News Site Map Contact Us
 
About NHP
Motor Control
Power Distribution
Hazardous Area Equipment & Control
Enclosure Systems & Power Quality
Automation
NHP Solutions
History
Management team
 
 
Application Categories
   
  Automation and Communication Solutions Automation and Communication Solutions
  Control and Switching Solutions Control and Switching Solutions
  Enclosures and Termination Solutions Enclosures and Termination Solutions
  Hazardous Location Solutions Hazardous Location Solutions
  Monitoring and Display Solutions Monitoring and Display Solutions
  Motor Control Solutions Motor Control Solutions
  Power Distribution Solutions Power Distribution Solutions
  Power Quality Solutions Power Quality Solutions
  Safety and Protection Solutions Safety and Protection Solutions
  Sensing and Detection Solutions Sensing and Detection Solutions
NHP - Energy Monitoring and Control Systems

Under the Green Star Office Design V3 Framework it is a conditional requirement that the base building achieves a minimum predicted rating of four stars using the NABERS Energy Rating System (formally ABGR scheme).

The NABERS Energy Rating System is designed to allow building owners, managers and tenants to benchmark greenhouse performance and gain market recognition for their performance.

The following two projects, involving NHP Electrical Engineering and Stowe Australia, have the metering and reporting infrastructure in place, to assist in meeting the NABERS energy requirements.

Please click on the links in the following case studies to view more information.

Greenfield Kens Project - Westpac Place

Client - Westpac
Builder - Leighton Contractors
Project Address - Kent Street, Erskine Street, Napolean Street and Sussex Street, Sydney
Metered Points - 253
Application - Mains failure at generator, zone lighting control, load shedding for peak demand reduction, sub metering & NABERS Energy compliant.

■ Energy management and control system (EMCS)
■ Electrical sub-metering
■ Tenancy sub-metering
■ Office lighting zone
■ Peak energy demand production capabilities
■ Power quality analysis
■ Annual, seasonal and quarterly reporting

space

Click here for more information on case study

Existing Building Retrofit - 388 George Street

Client - ING and Brookfield Multiplex
Asset Manager - Brookfield Multiplex
Project Address - 388 George Street, Sydney
Metered Points - 45 meters across 28 floors, 100 meters will be required for stage 2 of the project
Application - Tenancy metering & NABERS Energy compliant

■ Energy monitoring system (EMS)
■ Electrical sub-metering
■ Tenancy sub-metering
■ Annual, seasonal and quarterly reporting

space

Click here for more information on case study

Helping to accommodate "our" ABC

space

Click here for more information on case study

Electrical services for energy challenge

space

Click here for more information on case study

Top
Popular Links: | | | |
© NHP : Disclaimer  :  Privacy Policy  :  Resources  :  Sitemap  :  Print Friendly Page