Under the Green Star Office Design V3 Framework it is a conditional requirement that the base building achieves a minimum predicted rating of four stars using the NABERS Energy Rating System (formally ABGR scheme).
The NABERS Energy Rating System is designed to allow building owners, managers and tenants to benchmark greenhouse performance and gain market recognition for their performance.
The following two projects, involving NHP Electrical Engineering and Stowe Australia, have the metering and reporting infrastructure in place, to assist in meeting the NABERS energy requirements.
Please click on the links in the following case studies to view more information.
Greenfield Kens Project - Westpac Place
Client - Westpac
Builder - Leighton Contractors
Project Address - Kent Street, Erskine Street, Napolean
Street and Sussex Street, Sydney
Metered Points - 253
Application - Mains failure at generator,
zone lighting control, load shedding for peak demand
reduction, sub metering & NABERS Energy compliant.
■ Energy management and
control system (EMCS)
■ Electrical sub-metering
■ Tenancy sub-metering
■ Office lighting zone
■ Peak energy demand
production capabilities
■ Power quality analysis
■ Annual, seasonal and quarterly
reporting
|
|
Existing Building Retrofit - 388 George Street
Client - ING and Brookfield Multiplex
Asset Manager - Brookfield Multiplex
Project Address - 388 George Street, Sydney
Metered Points - 45 meters across 28 floors,
100 meters will be required for
stage 2 of the project
Application - Tenancy metering & NABERS Energy compliant
■ Energy monitoring system (EMS)
■ Electrical sub-metering
■ Tenancy sub-metering
■ Annual, seasonal and quarterly
reporting
|
|
Helping to accommodate "our" ABC
|
|